The PR all-purpose leaders fit different types of tool carrier and are suitable for:
driving steel, concrete, timber-piles with Fambo hammer
Soil drilling with drilling unit
driving and extracting sheet piles and steel piles with vibrator
PR leaders fit onto the bucket attachment of the tool carrier. If the rig has a quick-change head, changing from digger to piledriver takes about 10 min.
The leader design makes it ideal for difficult-to-reach sites such as:
limited headroom conditions
difficult corners
driving works on embankments or in shafts
The hydraulic drive is taken either from the tool carrier or from a separate hydraulic pump. The PR-leaders can be assembled on different carriers or excavators.